Please visit Jefferson Lab Event Policies and Guidance before planning your next event: https://www.jlab.org/conference_planning.

Oct 12 – 16, 2025
Newport News Marriott at City Center
US/Eastern timezone

Warm Front End upgrade for the PIP-II Linac

Oct 14, 2025, 2:50 PM
5m
Newport News Marriott at City Center

Newport News Marriott at City Center

740 Town Center Drive, Newport News, Virginia 23606
Poster

Speaker

Lennon Reyes (Fermilab)

Description

The warm front end for the PIP-II linac consists of an Ion-source an RFQ and four buncher cavities. The LLRF systems for these were the first ones developed more than a decade ago for use at the test stands. Some were VXI crate based and others used early generation FPGA boards that are light in resources. These LLRF systems and the one for the first superconducting cryomodule, the HWR will be upraded with the ARRIA10 SOCFPGA chassis with EPICS interfaces like the rest of the PIP-II Linac. The RFQ and the HWR have unique resonance control systems which are integrated into the LLRF controller hardware. The results of the initial testing with a cavity emulator will be presented.

Abstract Category Hardware

Author

Lennon Reyes (Fermilab)

Co-authors

Dr Philip Varghese (Fermilab) Shrividhyaa Sankar Raman (Fermilab) Matei Guran

Presentation materials

There are no materials yet.