Michael Geesaman
Description
One easily overlooked component of Low-Level Radio Frequency (LLRF) design is the commissioning of new system installations. During Jefferson Lab’s (JLab) 2024 Scheduled Accelerator Maintenance (SAM), two CEBAF zones were upgraded with C75 Cryomodules and JLab’s LLRF 3.0 system. JLab’s team has invested heavily in the automation and standardization of their commissioning process. Several key components of this process include verification of the interlocks, klystron characterization and cavity characterization. This poster will present a summary of LLRF commissioning at JLab.
Abstract Category | System and Operation |
---|