Please visit Jefferson Lab Event Policies and Guidance before planning your next event: https://www.jlab.org/conference_planning.

Oct 12 – 16, 2025
Newport News Marriott at City Center
US/Eastern timezone

Status of LCLS-II-HE LLRF Project

Oct 14, 2025, 2:25 PM
5m
Newport News Marriott at City Center

Newport News Marriott at City Center

740 Town Center Drive, Newport News, Virginia 23606
Oral or Poster

Speaker

JING CHEN (SLAC)

Description

The LCLS-II-HE project is a high-energy upgrade to the existing LCLS-II superconducting linac at SLAC, designed to increase the beam energy from 4 GeV to 8 GeV. This upgrade includes the addition of 184 high-energy (HE) SRF cavities operating at an average gradient of 22 MV/m, supplementing the 280 existing LCLS-II SRF cavities. To support these new cavities, the HE LLRF project will deploy 46 LLRF rack systems to provide precise RF field regulation—meeting amplitude and phase stability requirements of 0.01% and 0.01° RMS, and resonance control to maintain average cavity detuning below 1 Hz. This paper presents an overview of the HE LLRF project status, reviews system updates, and discusses readiness for the upcoming LLRF installation and checkout, along with key lessons learned throughout the project lifecycle.

Abstract Category System and Operation

Authors

Andre McCollough (SLAC) Andy Benwell (SLAC) Daron Chabot (SLAC) Darren Orrell (SLAC) JING CHEN (SLAC) Jorge Diaz (SLAC) Keith Penney (LBNL) Larry Doolittle (LBNL) Lucas Russo (LBNL) Qiang Du (Lawrence Berkeley National Laboratory) Shreeharshini Murthy (Lawrence Berkeley National Laboratory) Sonya Hoobler (SLAC) Vardani Karthik (SLAC) Zack Taylor (SLAC)

Presentation materials

There are no materials yet.