Speaker
Description
The LLRF system for the Mu2e project shares the same primary LLRF hardware as the Muon g-2 experiment which concluded its run last year. Commissioning of the subsystems for the Mu2e experiment is starting this year.The RF components for this system are located at large distances from the LLRF controller. 2.5 MHz beam bunches from the Recycler are transferred to the delivery ring into 2.36 MHz buckets for resonant extraction to the Mu2e beamline. The LLRF hardware is being upgraded to a larger FPGA board and additional functions such as the drivers for the AC dipole extinction magnets are being added to the system. A local FPGA controller chassis is being used to digitize the cavity signals and to co-ordinate the beam transfer manipulations. The system architecture is described and the results of the initial
testing presented.
Abstract Category | System and Operation |
---|