Mike Drury
03/04/2014, 09:00
What data was taken? how is it stored? Data access? Preliminary results.
Mike Drury
03/04/2014, 10:20
C50-11 Qs, gradients, onset field emission data. Any remaining regions of interests in improving C50 Qs. Is this a dead horse?
Rongli Geng
03/04/2014, 10:30
Data of magnetic/magnetized components surveyed. Correlation of C50-11 Q0 of individual cavities with the ambient magnetic field at SL10 slot.
Ramakrishna Bachimanchi
03/04/2014, 10:45
C100/R100 performance with beam. Challenges during initial beam operations.
Jonathan Creel
03/04/2014, 11:05
Status of the CHL-1/CHL-2 systems and performance during initial beam operations. Linac loads, pressure stablility and hat management to be presented with a bias towards cryogenic system needs.
Arne Freyberger
03/04/2014, 13:00
CEBAF schedule for beam operations and shutdowns for the next three years.
John Mammosser
03/04/2014, 13:15
Status and plans of Plasma processing. Recent test results on FEL02?
Clyde Mounts
03/04/2014, 13:50
What is needed to complete the hand-off for robust operations of the C100s by operators and crew chiefs. What is the plan? What is the schedule?
Mat Wright
03/04/2014, 14:25
CHL plans during the summer shutdowns, with emphasis on the impact to the Linac. Topics include: CHL-1 Maintenance summer of 2014, proposed 1.5kW external heater, modifications to support Linacs at 2K on one CHL, and anything else.
Mike Drury
03/04/2014, 14:40
Plan and schedule of SRF maintenance work for Summer 2014 (and beyond). Tuner stand-off modifications? tunnel cabling clean-up?
Steve Cooper
03/04/2014, 14:55
RF power maintenance planned for the Summer of 2014. R100 Kylstrons installation. Estimated consumables (klystrons, controls) for the next several years of operation.
ALL
03/04/2014, 15:10
Gradient maintenance. What needs to be done? What can be done at 2K? What can be done at 4K? Estimated time needed. Must, Shoulds and Likes