Arne Freyberger4/3/14, 1:00 PMCEBAF schedule for beam operations and shutdowns for the next three years.Go to contribution page
-
John Mammosser4/3/14, 1:15 PMStatus and plans of Plasma processing. Recent test results on FEL02?Go to contribution page
-
Joe Preble4/3/14, 1:35 PMC50-12 plan, schedule and status. Likely date of return to CEBAF?Go to contribution page
-
Clyde Mounts4/3/14, 1:50 PMWhat is needed to complete the hand-off for robust operations of the C100s by operators and crew chiefs. What is the plan? What is the schedule?Go to contribution page
-
Balsa Terzic4/3/14, 2:10 PMAlgorithm for minimization of trip rate and heat load.Go to contribution page
-
Mat Wright4/3/14, 2:25 PMCHL plans during the summer shutdowns, with emphasis on the impact to the Linac. Topics include: CHL-1 Maintenance summer of 2014, proposed 1.5kW external heater, modifications to support Linacs at 2K on one CHL, and anything else.Go to contribution page
-
Mike Drury4/3/14, 2:40 PMPlan and schedule of SRF maintenance work for Summer 2014 (and beyond). Tuner stand-off modifications? tunnel cabling clean-up?Go to contribution page
-
Steve Cooper4/3/14, 2:55 PMRF power maintenance planned for the Summer of 2014. R100 Kylstrons installation. Estimated consumables (klystrons, controls) for the next several years of operation.Go to contribution page
-
ALL4/3/14, 3:10 PMGradient maintenance. What needs to be done? What can be done at 2K? What can be done at 4K? Estimated time needed. Must, Shoulds and LikesGo to contribution page
-
Arne Freyberger4/3/14, 3:40 PMWith little gradient headroom, constant vigilance is required to achieve peak performance from the RF/SRF/Cryo systems. How shall we proceed? A strawman proposal will be presented and morphed into a robust plan with institutional buy-in from all parties. Peace in the middle east and an end to world hunger will be achieved, as well , during this discussion.Go to contribution page