-
1:30 PM
Real time emulation of power systems as a tool to contribute to accelerator reliability
-
HAYNES, Peter
(CERN)
-
1:30 PM
Availability Accounting at GSI
-
GEITHNER, Oksana
(GSI)
-
1:30 PM
Coordinating Equipment Removal and Installation In Anticipation of the EIC
-
GIORGIO, Caitlin
(Brookhaven National Laboratory)
-
1:30 PM
Anomaly Detection Efforts at BNL's C-AD
-
BLACKLER, Ian
(Brookhaven National Laboratory)
-
1:30 PM
Pulse Irregularities Data Collection and Analysis For BNL's AGS
-
BECKER, Eliorah
-
1:30 PM
A Transfer System for Short-lived Gaseous [11C]CO2 at the Saskatchewan Centre for Cyclotron Sciences
-
REGIER, Logan
(Sylvia Fedoruk Canadian Centre for Nuclear Innovation)
-
1:30 PM
Historical Evolution of RHIC Availability
-
MARR, Gregory
(Brookhaven National Laboratory)
-
1:30 PM
High reliable operation of the pre-accelerator complex for PETRA III
-
HAUPT, Dennis
(Deutsches Elektronen Sychrotron)
-
1:30 PM
Prepping RHIC for Summer running in 2023&24
-
SAMPSON, Paul
(BNL)
-
1:30 PM
Prep at BNL for the Electron Ion Collider
-
SAMPSON, Paul
(BNL)
-
1:30 PM
Why operations talk about functional positions and maintenance only knows assets
-
PERINIC, Goran
(CERN)
-
1:30 PM
The key elements and challenges for maintaining the machine protection systems at the European Spallation Source ERIC will be presented
-
CARROLL, Martin
(European Spallation Source ERIC)
-
1:30 PM
A Smart Alarm for the CEBAF Injector
-
TENNANT, Christopher
(Jefferson Lab)
-
1:30 PM
Machine Learning for Improved SRF Operation at CEBAF
-
TENNANT, Christopher
(Jefferson Lab)
-
1:30 PM
CLS Vacuum System Maintenance - Shift from Reactive to Preventative
-
KARY, Dana
(Canadian Light Source)
-
1:30 PM
Temperature prediction and control for accelerators by using automated piecewise linear and overlapped piecewise linear regression methods
-
BAI, Feng
(Brookhaven National Laboratory)
-
1:30 PM
In-Situ Leak Detection in SNS Superconducting Linac
-
GENG, Rongli
(ORNL)
-
1:30 PM
Operation of a novel hyper-redundant robot operation for in-situ accelerators components validation
-
DI CASTRO, Mario
(CERN)
-
1:30 PM
A Novel Quality Assurance Robot for RF Cavity Inspection System
-
DI CASTRO, Mario
(CERN)
-
1:30 PM
When in doubt, check the Wiki! / Using Wiki as Documentation at the Canadian Light Source
-
SMITH, Benjamen
(Canadian Light Source)
-
1:30 PM
Development of Custom Flow Switches for Target Water Cooling System
-
SMELTZER, Ryan
(Los Alamos National Laboratory)
-
1:30 PM
CERN’s applications for asset and maintenance management at the service of accelerator reliability
-
PERINIC, Goran
(CERN)
-
1:30 PM
Robotics Solutions for accelerators maintenance
-
DI CASTRO, Mario
(CERN)
-
1:30 PM
Improving the reliability of the 520 MeV Cyclotron and beamlines
-
GENGE, Kathleen
(TRIUMF)
PREDDY, Doug
(TRIUMF)
-
1:30 PM
Optimization of Enterprise Asset Management Configuration for Particle Accelerators
-
TERRY, Heather
(ORNL/SNS)
-
1:30 PM
Prediction of plasma instabilities in ECR ion sources with 48Ca operation
-
SIMON, Kundrat
(GSI)
-
1:30 PM
qBase. A databased application for advanced failure-handling and tracking to increase accelerators reliability @ DESY
-
KOEPKE, Siegfried
(DESY)
-
1:30 PM
Tools for continuous improvement of the reliability of the SOLEIL accelerators
-
NADOLSKI, Laurent
(Synchrotron SOLEIL)
-
1:30 PM
LINAC RF Tank 4 Upgrade of the Rutherford Appleton Laboratory Pulsed Neutron and Muon Source
-
SHEA, Declan
(Rutherford Appleton Laboratory)
BLINDELL, Francis
(Rutherford Appleton Laboratory)
CALDWELL-STEFFEN, Sinje
(Rutherford Appleton Laboratory)
JULIAN, Michael
(Rutherford Appleton Laboratory)
-
1:30 PM
Operation Statistics Analysis - Reliability and Fault Profiles of the CLS
-
SHARMA, Priya
-
1:30 PM
PLCverif: a tool to formally verify critical PLC programs
-
FERNANDEZ ADIEGO, Borja
(CERN)
-
1:30 PM
Reliability Centered Maintenance
-
UNAL, Resit
(Old Dominion University)
-
1:30 PM
Formal Methods Applied to Software Reliability in Particle Accelerators
-
FERNANDEZ ADIEGO, Borja
(CERN)
-
1:30 PM
Availability and Reliability Foundational Pillars of the NA-CONS Project at CERN
-
KANDHOL, Deepti
(CERN)
-
1:30 PM
Configuration Management and Operational Aspects in Experimental Areas at CERN
-
ROMAGNOLI, Giulia
(CERN)
-
1:30 PM
Methods to Systematically Reduce Beam Trip Frequencies at the Spallation Neutron Source*
-
PETERS, Charles
-
1:30 PM
Machine Protection Risk Management Lifecycle at the European Spallation Source ERIC
-
KÖVECSES, Szandra
(ESS (European Spallation Source ERIC))