Mar 24 – 26, 2025
US/Eastern timezone

Session

PWG - 2

Mar 24, 2025, 2:00 PM

Conveners

PWG - 2

  • Joe Grames (JLab)

Presentation materials

There are no materials yet.

  1. Kimberly Sawyer (JLab), David Dean (JLab)
    3/24/25, 2:00 PM
  2. Carlos Munoz Camacho (IJCLab, Orsay (CNRS/IN2P3))
    3/24/25, 2:30 PM
  3. Eric Voutier (Université Paris-Saclay - CNRS/IN2P3/IJCLab)
    3/24/25, 2:40 PM
  4. Axel Schmidt (George Washington University)
    3/24/25, 2:50 PM
  5. Michael Nycz (University of Virginia)
    3/24/25, 3:00 PM
  6. Dave Gaskell (Jefferson Lab)
    3/24/25, 3:10 PM
  7. Bogdan Wojtsekhowski (Jefferson Lab)
    3/24/25, 3:20 PM
  8. Salim Ogur (Jefferson Lab)
    3/24/25, 4:00 PM

    Jefferson Lab is planning an upgrade at the Continuous Electron Beam Accelerator Facility (CEBAF) to provide spin-polarized positrons to the experimental nuclear physics program. In this report, we present the beamline optics design which transports 123 MeV positrons beams created at the Low Energy Recirculator Facility (LERF) and injects them into CEBAF for acceleration to 12 GeV. The new...

    Go to contribution page
  9. Andriy Ushakov (JLab)
    3/24/25, 4:30 PM

    Progress in the development of the positron injector concept for the Ce+BAF is presented. The results of start-to-end positron beam tracking simulations for two injector operating modes (low current high polarized beam and high current low polarized beam) are discussed. The efficiency of the positron capture system based on a normal conducting focusing solenoid downstream of the conversion...

    Go to contribution page
  10. Shaoheng Wang (Jefferson Lab)
    3/24/25, 5:00 PM

    The Ce+BAF will be a CW positron source. In order to improve the efficiently capture the CW positron beam, a configuration of SRF cavities and solenoids beamline is explored. It is found that the SRF cavity could be used in CW positron capturing with high capturing efficiency.

    Go to contribution page
Building timetable...