SC1R IR Final Charge
8:30 AM
→
8:50 AM
Introduction
a. Outline
b. Charge
c. Design Status
d. Critical Components Status
e. Fabrication Status
f. FDR Recommendations
g. Traveler
Convener:
Kelly Dixon(Jefferson Lab)
slides
8:50 AM
→
9:10 AM
Insulation Overview
a. Insulation on internal piping spools
b. Insulation on CC casings
c. Insulation on Top Torispherical head
d. Insulation on vacuum vessel shell
e. Insulation on internal frame and HX
Convener:
MrNate Laverdure(Jefferson Lab)
slides
9:10 AM
→
9:40 AM
SC1R 2K Cold Box Rigging Overview & Platform
a. Platform review
b. Building modification requirements
c. Removal of the existing 2K cold box
d. SC1R 2K cold box installation plan
e. Safety
Convener:
Thomas Renzo(Jefferson Lab)
slides
9:40 AM
→
10:00 AM
U-tubes and other auxiliary piping installation
Convener:
MrCorey Butler(Mechanical Designer Jefferson Lab)